The Town of Holly Springs is upgrading the pump station located at 779 Ancient Oaks Drive. This pump station helps transfer wastewater to the town’s treatment plant. While the infrastructure located within the pump station site will be improved as part of this project to serve the area’s drainage basin, the pump station site boundaries will remain the same.

Construction

  • The notice to proceed was issued in April 2022. Construction is anticipated to begin in mid to late May and continue through the end of 2022.
  • Construction hours will be limited to 7 a.m.-6 p.m., Monday through Friday. 
  • Residents near the pump station can expect to hear construction-related noise during these hours, and the town’s contractor will minimize noise as much as possible. Residents also can expect construction-related equipment at the pump station throughout the duration of the project, as well as construction vehicles at the pump station.