Holly Springs Road Widening - Central (Main to Flint Point)

Widening Holly Springs Road to a consistent median-divided, four-lane road with sidewalks.

Location:

Holly Springs Road from Main Street to Flint Point Lane

Status:

In design

Estimated construction start:

2024

Related Projects

Other widening projects for Holly Springs Road include:

Contact:

Holly Springs Engineering: (919) 577-3938