Widening Holly Springs Road to a consistent median-divided, four-lane road with sidewalks.
Location:
Holly Springs Road from Main Street to Flint Point Lane
Status:
In design
Estimated construction start:
2024
Related Projects
Other widening projects for Holly Springs Road include:
Contact:
Holly Springs Engineering: (919) 577-3938