- Home
- Projects & Initiatives
- Transportation Projects
Transportation Projects
-
Avent Ferry Downtown Pedestrian Improvements
Sidewalk connection along Avent Ferry Road in downtown Holly Springs joining the existing sidewalk at the Rex Holly Springs Hospital campus with sidewalk at The Block on Main.
Link to page -
Avent Ferry Road Widening - Ralph Stephens to Cass Holt
Widening Avent Ferry Road between Ralph Stephens and Cass Holt roads to a consistent median-divided, four-lane road with sidewalks on both sides.
Link to page -
Holly Springs Road Widening
Improving Holly Springs Road to a consistent four-lane, median-divided road with sidewalk, curb and gutter, and pedestrian crossings.
Link to page -
Intelligent Transportation System
The Town of Holly Springs is implementing an Intelligent Transportation System that uses smart technology to help mitigate congestion.
Link to page -
Main Street Sidewalk Connection - Arbor Creek Drive to Trellis Pointe
Adding 1,125 linear feet of sidewalk along Main Street, connecting the Arbor Creek neighborhood sidewalks with the sidewalk along Main Street at Trellis Pointe apartments, near North Main Athletic Complex. Once completed, the 5-foot-wide sidewalk will extend from Arbor Creek, past North Main Athletic Complex, through downtown Holly Springs, where existing sidewalks connect with other parks, greenways, and businesses.
Link to page -
Main Street Turn Lane
Adding new right turn lane on Main Street (from near Earp Street to Holly Springs Road), giving turning traffic a place to stack so northbound through-traffic on Main Street can keep moving.
Link to page
-
Microtransit Service
The Holly Springs Hopper microtransit service is geared to help residents get around Holly Springs conveniently and for fares that cost less than a cup of coffee. Similar to Uber and Lyft, microtransit is a ride-sharing service that offers on-demand trips within a designated area.
Link to page -
NC 55 Turn Lane (Avent Ferry to Main Street)
Adding new right turn lane southbound from Avent Ferry Road to South Main Street, improving traffic flow onto South Main Street.
Link to page -
North Main Athletic Complex-Oak Hall Greenway Connection
The Town is working with a design firm to plan another safe and convenient way for residents to access the North Main Athletic Complex. This greenway connection would travel from the existing park greenway along a proposed route connecting to Muses Mill Court in the Oak Hall neighborhood. The new, approximately 1,050-foot greenway connection would include a pedestrian bridge across Long Branch Creek.
Link to page -
Street Resurfacing 2025
The Town is resurfacing nearly 5 miles of asphalt along 21 streets in Holly Springs this year.
Link to page -
Transportation Bond Projects
Projects funded by the $40 million transportation bond approved by voters in 2018.
Link to page -
Utley Creek Greenway - Morgan Park to Holly Glen
Connecting west and east Holly Springs, from West Ballentine Street near the Oaks of Avent Acres club house, along an existing greenway, through an existing pedestrian tunnel under NC 55, to the Morgan Park greenway.
Link to page