This sidewalk connection along Avent Ferry Road in downtown Holly Springs will join the existing sidewalk at the Rex Holly Springs Hospital campus with the sidewalk at The Block on Main. The 8-foot-wide concrete sidewalk spans about 1,150 linear feet.
Status:
Substantial construction is anticipated to be completed at the end of 2025.